Skip to main content

Table 2 Operating parameters in the water treatment plant

From: Complex odor control based on ozonation/GAC advanced treatment: optimization and application in one full-scale water treatment plant

Process

Designed contact time (min)

Coagulant (aluminum sulfate) concentration (mg L−1)a

Ozone dosage (mg L−1)a

Actual contact time (min)

Backwash frequency

Pre-ozonation

3

–

0–1.0

3.4

–

Flocculation

20

20–30

–

23

–

Sedimentation

120

–

–

137

–

Sand filtration

30

–

–

34

24–48 h

Post-ozonation

12

–

0–1.5

14

–

GAC

12

–

–

14

5–10 days

  1. aCoagulant concentration and ozone dosage may vary according to the actual influent qualities