Fig. 9From: Pilot-scale electro-kinetic remediation of lead polluted field sediments: model designation, numerical simulation, and feasibility evaluationValidation of simulation: pilot experimental data plotted versus simulated pH (a) and Pb distributions (b) alone the median anode–cathode axis under EKR (0.5 V/cm) with optimal EPI duration of 12 hBack to article page