Model Evaluation | Pre-dam | Post-dam | Pre-dam (Cai) | |||
---|---|---|---|---|---|---|
Period | Calibration | Validation | Calibration | Validation | Calibration | Validation |
1952–1961 | 1962–1966 | 1972–1979 | 1980–1983 | 1952–1961 | 1973–1982 | |
RMSE | 0.92 | 0.96 | 0.93 | 1.03 | 0.90 | 1.31 |
NSE | 0.99 | 0.99 | 0.99 | 0.98 | 0.99 | 0.97 |