Fig. 9From: Natural attenuation along subsurface flow paths based on modeling and monitoring of a pesticide metabolite from three case studiesOverview on the area of concern at treated site in Catchment II with calculated groundwater flow (end of 2005); flow time between two following arrows of direction amounts 30 days; solid line marks the mainly affected abstraction well 17-915 (based on unpublished expert report [25])Back to article page