Fig. 6From: Pilot-scale electro-kinetic remediation of lead polluted field sediments: model designation, numerical simulation, and feasibility evaluationSimulated sediment Pb distributions under EKR (0.5 V/cm) with EPI duration of 6 h, 12 h, and 24 hBack to article page