Skip to main content

Table 6 Time schedule for exposure experiments performed at the bypass stations with fresh fertilized trout eggs

From: Efficiency of advanced wastewater treatment technologies for the reduction of hormonal activity in effluents and connected surface water bodies by means of vitellogenin analyses in rainbow trout (Oncorhynchus mykiss) and brown trout (Salmo trutta f. fario)

Start of exposure

End of exposure

Exposure duration

Exposure type

Trout species

Winter season 2012/2013 prior to the upgrade

 07 Dec 2012

20 Mar 2013

103 days

Laboratory neg. control

Rainbow trout

 07 Dec 2012

21 Mar 2013

104 days

Exposure in bypass systems

Rainbow trout

Results of exposure experiments using juvenile brown trout are published in Henneberg et al. [22].

Winter season 2013/2014 after the upgrade

 24 Nov 2013

3 Mar 2014

99 days

Laboratory neg. control

Brown and rainbow trout

 24 Nov 2013

4 Mar 2014

100 days

Exposure in bypass systems

Brown and rainbow trout

 7 Mar 2014

28 Mar 2014

22 days

EE2 control

Brown and rainbow trout